Arelion Baltic-2• 4 landing points
Status Legend
Operational
Fault
Degraded
Maintenance
Landing Station
Status & Statistics
0/2
Active Segments
0
Degraded
2
Down
Fault
Current Status
300 km
Length
10 Tbps
Capacity
4
Landing Points
Segments (2)
| Segment | Route | Length | Capacity | Status | ETA | ||
|---|---|---|---|---|---|---|---|
Sweden-Estonia trunk | Stockholm CLSHiiumaa CLS | — | — | Down | — | ||
Status since:Dec 25, 2024 Affected Capacity 100% Fault location: Severed at two distinct locations in Estonia EEZ on Christmas Day. Under investigation; suspected hybrid warfare/sabotage linked to Fitburg incident. | |||||||
Finland-Estonia trunk | Helsinki CLSTallinn CLS | — | — | Down | — | ||
Status since:Dec 26, 2024 Affected Capacity 100% Fault location: Fault detected Dec 26, 2024; likely related to Dec 25 incident in Gulf of Finland. Parallel to Elisa cable. | |||||||
Network Topology
Click on a node or segment to view details
Legend
Landing Station
Branching Unit
Active
Down
Degraded
Maintenance
Ownership
ArelionPrimary
100.00%Landing Points (4)
1
Stockholm CLS
Stockholm, SE
2
Hiiumaa CLS
Hiiumaa, EE
3
Helsinki CLS
Helsinki, FI
4
Tallinn CLS
Tallinn, EE
4 landing points connected
300 km total lengthOutage History
Active Outages (2)
Sweden-Estonia
ActiveStockholm CLSHiiumaa CLS
Baltic Sea cable severed between Sweden and Estonia. Investigation indicates anchor damage from vessel.
Reported Jan 3, 2026
Ongoing
Sweden-Estonia
ActiveStockholm CLSHiiumaa CLS
Severed at two distinct locations in Estonia's EEZ. Under investigation; suspected hybrid warfare/sabotage linked to the Fitburg incident.
Reported Dec 30, 2025
Ongoing
